Hillpoint Elementary School


 Design & Technical Information

In April 2006, Suffolk Public Schools hired RRMM Architects to design a new 800-student prototypical elementary school. This design is a modified version of our Creekside Elementary prototype with two-story classroom wings in order to fit a more compact site. Construction is currently underway with completion scheduled for Fall 2008. The design provides the following distinguishing features:

  • Clear separation of academic houses that allow for grade level separation, natural light through exterior windows and easy separation from public areas
  • Commons spaces, teacher centers, and restroom cores in each house
  • A gym and cafeteria arrangement that allows sharing of the two spaces for special large-group events
  • A plan that is flexible and easily modified to fit the specific needs of the school system
  • Media Center is central to plan, accessible to public with natural lighting through clerestory windows
  • Clear separation of bus and automobile traffic for safe egress from the site and congestion reduction
  • Building exterior exhibits a “playful” character but incorporates low-maintenance, enduring materials

Project Highlights

New 800 Student Elementary School

98,964-SF

$15,900,069

Completion Date: Fall 2008

.

School Snapshot
Grades - Pre-K through 5
Motto -
Principal - Ronald Leigh
Assistant Principal -


Average Class Size
-
Parent to Contact -



school website:


 

 
   
 

site design by C. Baugh | chrisbaugh@spsk12.net
2005 Suffolk Public Schools
page last updated 7/18/05